2010

With the development of approximately 130,000 square metres, the first phase of intervention in the Milanofiori Nord development area was concluded. It includes the construction of the U4, U7, U9 and U10 buildings, the completion of the U15 building, the retail buildings, the commercial square, a multiplex cinema, a fitness centre, a hotel and the residential complexes “Residenze le Rogge” (“R1”), and “R3”.

Comments Off on 2010

2006

Start-up of the building site for the construction of Milanofiori Nord.

Comments Off on 2006

2003

Next to the Mediolanum Forum the Teatro Repower was built. 
With a capacity of 1,730 spectators, it is a theater mainly dedicated to musical productions.

Comments Off on 2003

1990

The “Forum of Milan”, which is today called Mediolanum Forum, opened. 
With a covered area of over 40,000 square metres, and a central arena with a seating capacity up to 12,700 people, it is the main covered multifunctional venue in the north of Italy and it hosts an average of over 2 million visitors per year during concerts and sporting events. The Mediolanum Forum also provides plenty of sport facilities from fitness activities to ice skating, squash, swimming, bowling and other sports.

Comments Off on 1990

1976

Works began on the construction site of the Milanofiori Business Centre in Assago, which ended in the 1980s. 
With over 600,000 square metres built, the Milanofiori Business Centre is still considered one of the largest and most functional office districts in Italy.

Comments Off on 1976

2011

In February the Subway line 2 arrives in Assago, with two stations: M2 Milanofiori Nord and M2 Milanofiori Forum. 
In July, Milanofiori 2000 sold or leased approximately 115,000 square metres, equal to 86% of the entire gross floor area built in the Milanofiori Nord area: the retail park was fully leased; the U4, U7, and U9 offices were sold for a total of approximately 33,800 square metres; the U15 building, of about 10,000 square metres, was leased to GroupM.

Comments Off on 2011

2014

Approximately 160,000 square metres of the Milanofiori Nord complex were completed.
In January, the U27 building (22,000 square metres for office use) was delivered to Nestlé Italiana.

Comments Off on 2014

2016

Completion of the U16 building for the Puma Italia headquarters (approximately 1,800 square metres).

Comments Off on 2016

2019

Start of construction of U1 office building (about 31,000 square metres) and U3 (about 11,000 square metres).

Comments Off on 2019